::::: : the wood : davidrobins.com

Christmas, 2018, workshop power

News, Baby ·Monday January 1, 2018 @ 00:04 EST (link)


We drove back home New Year's day (because some people must see the New York City ball drop amidst a crowd of freezing idiots with no bathroom facilities), had a fine trip drive (although DGR got a little grumpy toward the end), and a little bit of a holiday at home before going back to work on the 2nd.

David Geoffrey got a lot of great new clothing, some of which can be seen above (and in the previous post), like the plaid shirt (onesie) and overalls from aunt Sharon, and some toys (many musical), mostly not shown, although one shows him on the mat with the blue arch and "foot piano" that we got him and there's one of a "sensations ball" with protuberances of different materials that he likes to bite. At time of writing, which is acutally the 12th, he's 15 pounds 6 ounces and 26 inches (and just had his 4-month vaccinations, which did not please him at all)!

Some progress has also been made on getting power to the workshop/shed, although many steps back as well. The "electrician" I hired managed to dig the trench and get the wires across, but left destruction as he went: his digging machine mangled our buried propane pipe (which I'd warned him about in advance), and even after repairing that section it still seems to be leaking (pulled out further down?) and will need further repair—fortunately we do have someone competent that did the first repair and can probably do the rest. Evidence shows no grounding rod installed (no connection to the panel); to put in the connection in the service panel he apparently disconnected our generator transfer switch, and left a gap in another panel, which may need an electrician to repair. He also connected ground from the service panel to the neutral bar in the sub-panel, which is wrong and potentially dangerous (a separate ground bar is required). We will be doing a chargeback and paying competent professionals to finish the work; I brought a grounding rod (8' long 5/8" diameter copper) home (in the Civic—back seat down) and ground bar home today, and hopefully can be back on track this weekend. Even if not, I can rough in the lights and receptacles and not connect them until ready. I also have Ethernet in the workshop (maybe for a security camera), but it needs to be pulled across the garage to the switch; I just wanted to have it put in the trench while it was open.